Sources · Who Pays? · Episode 1
Who Really Pays for the AI Boom?
Every figure shown on screen in this episode, with the document, page and date it comes from, and a label for how strong the evidence is.
A data center can bring its county serious tax revenue, about $1.2 billion in Loudoun County in fiscal year 2026, while drawing on a shared grid, water and land. Who carries the other costs depends on where it is built, how it operates and what its agreements require; in one PJM capacity auction, a market monitor’s model put the extra cost to other customers at roughly $6.5 billion.
- Published
- 17 September 2026
- Length
- 16:21
- Figures checked
- 26 September 2026
- Documents
- 21
On screen in this episode
37The document shows it, and you can check it yourself.
12Someone says so, but nothing independent backs it up.
10Something that matters is missing from every source we checked.
1Our own arithmetic from the sourced numbers. The method is below.
What isn’t shown
- 1:53WHAT THE STUDY DOES — AND DOES NOT — SHOW · ~15% · THIS SUPPORT WORKPLACE · EVERY AI PRODUCT · THE WHOLE ECONOMY · Not established by this result · Average issues resolved per hour in the studied workplace
- 2:39REVENUE IS NOT THE SAME AS NET BENEFIT · REPORTED REVENUE ~$1.2bn · FY2026 property taxes · OVERALL COSTS ? · Not quantified by this figure · No net-benefit total can be inferred here
- 6:09WHOLESALE MODEL · AUCTION ESTIMATE 2027–2028 ≠ HOUSEHOLD BILL · NOT MEASURED HERE
- 7:07WHO CARRIES THE RISK? · PROTECTION ≠ NO RISK
- 9:06PHOTO ≠ PROJECT PROOF · LOCATION MUST BE VERIFIED · LOCATION · DEVELOPMENT HISTORY · LINK TO PROJECT · EVIDENCE REQUIRED
- 10:52WATER USE ≠ LAKE-LEVEL ATTRIBUTION
- 11:02“AI DRIED THE LAKE” / NOT ESTABLISHED
- 11:39DESIGN ≠ ENTIRE OPERATING FLEET · ELECTRICITY + MANUFACTURING STILL MATTER
- 12:45DIFFERENT ACCOUNTING BOUNDARIES · COMPANY-WIDE ≠ AI-ONLY
- 13:40OPERATING HEAT PLANT ≠ SERVER HEAT NOW · CURRENT OPERATION / FUTURE CONNECTION
On screen, in order
- 0:27
$1.2bn · Loudoun · FY2026 reported property-tax revenue
County-reported real and personal property tax revenue from data centers, fiscal year 2026.
- [1] Loudoun County, The Loudoun Story, Loudoun’s Data Centers by the Numbers
- 0:50
AI · cloud · mixed workloads · A data center is not automatically an AI-only facility
- 1:00
485 TWh · 2025 estimate · electricity · worldwide · ALL DATA CENTERS · IEA · Energy and AI, 2026
IEA estimate for all data centres worldwide. The on-screen credit shortens the title of the 2026 report.
- [2] IEA, Key Questions on Energy and AI (2026), Executive summary: 485 TWh in 2025 to 950 TWh in 2030
- 1:09
485 → 950 TWh · 2025 estimate → 2030 central projection · ALL DATA CENTERS · IEA · forecast, not a meter reading (3D blocks for the two values)
950 TWh is the IEA’s central projection for 2030, not a measurement.
- [2] IEA, Key Questions on Energy and AI (2026), Executive summary: 485 TWh in 2025 to 950 TWh in 2030
- 1:17
More than chatbots · Scope: all data centers
The IEA figures cover all data centres, not only AI.
- [2] IEA, Key Questions on Energy and AI (2026), Executive summary: data centre demand +17% and AI-focused data centres +50% in 2025
- 1:37
RESEARCH / CUSTOMER SUPPORT · 5,172 · customer-support agents · One workplace setting · Brynjolfsson, Li & Raymond · Generative AI at Work
Chat support agents serving one Fortune 500 software company, directly or through outsourcing firms.
- [4] Brynjolfsson, Li & Raymond, Generative AI at Work (v2), abstract; p. 3; p. 10, Data
- 1:43
STUDY RESULT / AVERAGE · Issues resolved per hour · Baseline (indexed) 100 · With AI assistance 115 · Indexed baseline = 100 · not actual issue counts
- [4] Brynjolfsson, Li & Raymond, Generative AI at Work (v2), abstract
- 1:45
~15% higher on average · Benefits varied across workers · One application. One workplace.
Average rise in issues resolved per hour, with large differences between workers.
- [4] Brynjolfsson, Li & Raymond, Generative AI at Work (v2), abstract; p. 3
- 1:53
WHAT THE STUDY DOES — AND DOES NOT — SHOW · ~15% · THIS SUPPORT WORKPLACE · EVERY AI PRODUCT · THE WHOLE ECONOMY · Not established by this result · Average issues resolved per hour in the studied workplace
The authors describe medium-run effects within a single firm and say the paper does not address aggregate employment or wage effects.
- Checked[4] Brynjolfsson, Li & Raymond, Generative AI at Work (v2), p. 3
- 2:14
Loudoun County · Virginia, United States · County outline: US Census Bureau · campus is illustrative
Locator map. The campus model is illustrative.
- [5] U.S. Census Bureau county boundaries (2018), Loudoun County, GEOID 51107
- 2:21
LOUDOUN COUNTY / VIRGINIA · ~$1.2 billion · FISCAL YEAR 2026 · Real + personal property tax revenue · County-reported figure · Loudoun County
The county’s own figure, from its web page.
- [1] Loudoun County, The Loudoun Story, Loudoun’s Data Centers by the Numbers
- 2:39
REVENUE IS NOT THE SAME AS NET BENEFIT · REPORTED REVENUE ~$1.2bn · FY2026 property taxes · OVERALL COSTS ? · Not quantified by this figure · No net-benefit total can be inferred here
The county reports gross revenue; no net figure after costs is given.
- Checked[1] Loudoun County, The Loudoun Story
- 2:44
RESULTS DEPEND ON THE LOCAL TAX RULES · LOUDOUN ~$1.2bn · FY2026 property taxes · ANOTHER COUNTY ? · Different rules · unknown result · Loudoun’s result cannot simply be copied elsewhere
JLARC: local data center revenue depends on factors such as the size of the local market and local tax rates.
- [3] JLARC Report 598, Data Centers in Virginia (2024), p. i
- 2:48
WHY A COUNTY MIGHT WELCOME THE CAMPUS · A valuable tax base · Buildings · Equipment · Reported revenue is substantial; total costs still matter
- 3:18
Source: JLARC · Data Centers in Virginia (2024) · CONSTRUCTION WORK (sign on the model crane)
Narration: much of the industry’s economic benefit came from construction rather than ongoing operations.
- [3] JLARC Report 598, Data Centers in Virginia (2024), p. i; p. 15
- 4:01
VIRGINIA / JANUARY 2026 · MODELED FISCAL RETURN · Positive · State + local combined · REPORT SUMMARY / NOT A FACSIMILE
Five-year model for investments in fiscal years 2024–2025: estimated state and local tax revenue exceeds the exemption’s value by $2.1 billion.
- [6] Virginia Tax and VEDP, data center exemption report, p. 4; Table 2, pp. 4–5
- 4:10
WITH INCENTIVE · ILLUSTRATIVE SCENARIO · WITHOUT INCENTIVE · ILLUSTRATIVE SCENARIO
The scenes are illustrations. The report assumes, after JLARC, that 90% of this investment would not have come to Virginia without the exemption.
- [6] Virginia Tax and VEDP, data center exemption report, pp. 5–6; Table 3
- 4:15
MODEL BOUNDARY · LOCAL INCENTIVES · EXCLUDED
Local discretionary incentives are not included in the model.
- [6] Virginia Tax and VEDP, data center exemption report, p. 7, Assumptions; p. 9, Limitations
- 5:36
Source: Monitoring Analytics · PJM market monitor · PJM · CAPACITY AUCTION · 2027–2028 DELIVERY YEAR
Base Residual Auction for the 2027/2028 delivery year, held 4–10 December 2025.
- [7] Market monitor, 2027/2028 PJM auction analysis, p. 1
- 5:57
MODELED DIFFERENCE · DATA CENTER DEMAND · COSTS FOR OTHER CUSTOMERS · ~$6.5 BILLION · vs demand excluded · 2027–2028 / WHOLESALE
$6,497,653,512 (Scenario 4), shown rounded: the auction cleared again without existing and forecast data center load.
- [7] Market monitor, 2027/2028 PJM auction analysis, p. 3, Table 1; p. 5
- 6:09
WHOLESALE MODEL · AUCTION ESTIMATE 2027–2028 ≠ HOUSEHOLD BILL · NOT MEASURED HERE
The analysis models one capacity auction; it does not measure household bills.
- Checked[7] Market monitor, 2027/2028 PJM auction analysis
- 6:29
OHIO · 2025 · AEP OHIO / TARIFF · SUMMARY / NOT A FACSIMILE · Source: PUCO · AEP Ohio tariff approval (2025)
On 9 July 2025 PUCO adopted a settlement and ordered AEP Ohio to file data center tariffs.
- [8] PUCO announcement, 9 July 2025
- 6:45
MINIMUM PAYMENTS · FINANCIAL PROTECTIONS
The terms (minimum monthly demand charges and collateral, in effect from 23 July 2025) are as AEP Ohio describes its tariff. PUCO's announcement confirms the tariff order but does not list the terms, and the order itself could not be opened.
- 7:07
WHO CARRIES THE RISK? · PROTECTION ≠ NO RISK
- 7:20
Source: IEA · Energy and AI · SPARE SUPPLY · DIFFERENT STARTING CONDITION
IEA: with excess supply, load growth can lower prices; in tighter systems it can raise them.
- [2] IEA, Key Questions on Energy and AI (2026), Executive summary, section on data centres and electricity prices
- 7:49
AIR POLLUTION · GREENHOUSE GASES · WATER USE · WASTE
- [10] EPA, electricity system and the environment, Environmental Impacts of the Electricity System
- 7:56
GENERATION · ACCESS ROAD · FUEL ROUTE · POWER LINES
- 8:09
Source: IEA · United States · GROWING DEMAND · Includes data centers · RETIREMENT TIMING · NOT THE ONLY FACTOR
IEA: the U.S. government has moved to delay coal plant retirements in response to strong demand growth, including from data centres.
- [12] IEA, Electricity 2026: Supply, United States
- 8:39
HABITAT CROSSING · COLLISION RISK · ELECTROCUTION RISK · SOME CONFIGURATIONS · Illustrative risk · no actual incident depicted
- 8:47
Source: U.S. Fish & Wildlife Service · avian protection · RISK REDUCTION · SITING + DESIGN
Siting lines outside high-risk areas and avian-safe designs.
- [13] USFWS, power line measures for birds, What can I do to avoid and minimize impacts to birds?
- 9:06
PHOTO ≠ PROJECT PROOF · LOCATION MUST BE VERIFIED · LOCATION · DEVELOPMENT HISTORY · LINK TO PROJECT · EVIDENCE REQUIRED
No habitat loss from a specific AI project is documented in this episode; the card lists the evidence such a claim would need.
- 9:29
SERVER HEAT · EVAPORATION · LEAVES LOCAL SUPPLY
Evaporation in cooling towers raises concerns about local water consumption and availability.
- [14] Berkeley Lab, 2024 U.S. data center energy report, pp. 40–41, Table 4.2; p. 56
- 9:39
WITHDRAWAL · CONSUMPTION · RETURNED
Consumption is withdrawn water permanently removed from the immediate water cycle.
- [14] Berkeley Lab, 2024 U.S. data center energy report, p. 56, definition of water consumption
- 9:49
ELECTRICITY GENERATION · WATER CONSUMED ELSEWHERE
Indirect water use occurs at the power plants that supply the electricity.
- [14] Berkeley Lab, 2024 U.S. data center energy report, pp. 56–57
- 9:54
US DATA CENTERS / 2023 · BERKELEY LAB ESTIMATES / ALL DATA CENTERS · DIRECT · 66 bn litres
Direct water consumption, all U.S. data centers, 2023.
- [14] Berkeley Lab, 2024 U.S. data center energy report, p. 55; Figure 5.9, p. 56
- 10:01
ELECTRICITY SUPPLY · ~800 bn litres · MODELED INDIRECT USE
Nearly 800 billion liters, modeled from the regional grid mix; purchase agreements and on-site generation are not included.
- [14] Berkeley Lab, 2024 U.S. data center energy report, pp. 57–58
- 10:24
GREAT SALT LAKE / UTAH · NASA GODDARD / LANDSAT / 1984–2023 (satellite time series of the lake)
- [15] NASA SVS 15020, The Shrinking Great Salt Lake
- 10:38
UPSTREAM DIVERSIONS + CHANGING CLIMATE
NASA names upstream water diversions and a shifting climate as the drivers of the decline.
- [15] NASA SVS 15020, The Shrinking Great Salt Lake
- 10:43
WATER-USE RECORDS · 7 / 22 facilities · 2024 PUBLIC-RECORDS INVESTIGATION · Source: Aspen Tech Policy Hub · Utah (2024) (7 of 22 tiles highlighted)
Records obtained for 7 of the 22 data centers in the basin; about 15 others have unknown water use.
- [16] Aspen Policy Academy, Great Salt Lake fact sheet, p. 1, Overview; p. 3
- 10:52
WATER USE ≠ LAKE-LEVEL ATTRIBUTION
- 10:57
SAMPLE ≠ GENERATIVE AI ONLY
The sample includes the NSA’s Utah Data Center.
- [16] Aspen Policy Academy, Great Salt Lake fact sheet, pp. 2–3
- 11:02
“AI DRIED THE LAKE” / NOT ESTABLISHED
- 11:24
COLD PLATE / CHIP · MICROSOFT / NEW DESIGNS · INTENDED TO AVOID COOLING EVAPORATION
Microsoft describes a new AI datacenter design that cools chips in a closed loop without water evaporation.
- [17] Microsoft blog, water intensity and cooling, Early water stewardship by design; Datacenter cooling methods, explained
- 11:34
HEAT TO OUTDOOR AIR · COMPANY DESCRIPTION / ILLUSTRATIVE MECHANISM
Microsoft: air-cooled chillers remove heat from closed coolant loops using outside air.
- [17] Microsoft blog, water intensity and cooling, Datacenter cooling methods, explained
- 11:39
DESIGN ≠ ENTIRE OPERATING FLEET · ELECTRICITY + MANUFACTURING STILL MATTER
The zero-water design is for new AI datacenters; the post does not address water used to generate the electricity or make the equipment.
- Checked[17] Microsoft blog, water intensity and cooling
- 11:47
LIQUID AT THE CHIP · ONE STAGE IN THE SYSTEM · FINAL HEAT RELEASE
Closed-loop, direct-to-chip cooling as Microsoft describes it.
- [17] Microsoft blog, water intensity and cooling, Datacenter cooling methods, explained
- 12:10
RESOURCES PER TASK · TASK VOLUME + COMPLEXITY
IEA: energy use per AI query has fallen sharply while more energy-intensive uses spread.
- [2] IEA, Key Questions on Energy and AI (2026), Executive summary: energy per AI query and energy-intensive use cases
- 12:21
GOOGLE / 2026 ENVIRONMENTAL REPORT · COMPANY-REPORTED 2025 DATA / YEAR-ON-YEAR · ELECTRICITY USE +37% · TOTAL COMPANY ELECTRICITY · 2024 = 100 / EACH OWN BASELINE (paired bars)
Google’s total electricity consumption grew 37% in 2025.
- [18] Google 2026 Environmental Report, p. 19
- 12:32
OPERATIONAL EMISSIONS −2% · SCOPE 1 + MARKET-BASED SCOPE 2
- [18] Google 2026 Environmental Report, pp. 74–75
- 12:40
AMBITION-BASED EMISSIONS +18% · BROADER COMPANY MEASURE
Google attributes the growth mainly to supply-chain activities; its supply-chain emissions rose 25% in 2025.
- [18] Google 2026 Environmental Report, pp. 74–75
- 12:45
DIFFERENT ACCOUNTING BOUNDARIES · COMPANY-WIDE ≠ AI-ONLY
The electricity and emissions figures shown are company-wide; they are not an AI-only footprint.
- Checked[18] Google 2026 Environmental Report
- 12:57
MANUFACTURE · USE · REPLACEMENT · DISPOSAL · Source: Wang et al. · Nature Computational Science (2024) · FUTURE E-WASTE · DEPENDS ON GROWTH + EQUIPMENT LIFE
Scenario study: projected e-waste varies with AI growth settings and server turnover.
- [19] Wang et al., Nature Computational Science (2024), abstract
- 13:20
FINLAND / FORTUM + MICROSOFT · ESPOO + KIRKKONUMMI / DISTRICT HEATING
Heat pump plants at Kolabacken (Kirkkonummi) and Hepokorpi (Espoo), the sites of two Microsoft data centres.
- [20] Fortum news, 6 May 2026
- 13:27
FORTUM UPDATE / MAY 2026 · HEAT PRODUCTION STARTED · USING OTHER SOURCES
On 6 May 2026 the plants ran on ambient-air heat pumps and electric boilers.
- [20] Fortum news, 6 May 2026
- 13:34
DATA CENTER WASTE HEAT · PLANNED IN STAGES / FROM 2027
The 6 May 2026 release puts the start of waste-heat recovery in the following year, in stages.
- [20] Fortum news, 6 May 2026
- 13:40
OPERATING HEAT PLANT ≠ SERVER HEAT NOW · CURRENT OPERATION / FUTURE CONNECTION
On 6 May 2026 the plants ran on other sources; recovery of data centre heat was to start the following year.
- Checked[20] Fortum news, 6 May 2026
- 14:22
PJM / LARGE-LOAD FORECAST SCREENING · ILLUSTRATIVE PLANNING / NOT A FORECAST · Source: PJM · 2026 forecast update · ANNOUNCED · OPERATING
PJM says it vets large-load requests for how likely they are and for double counting, and derates non-firm projects.
- [21] PJM Inside Lines, 2026 load forecast, Improving the Forecast for Large Load Additions
- 15:07
WHO PAYS FOR THE AI BOOM? · INVESTORS + CUSTOMERS · HOST COMMUNITIES CAN BENEFIT
- 15:24
OTHER ELECTRICITY USERS
Recap of the modeled auction result at 5:57.
- [7] Market monitor, 2027/2028 PJM auction analysis, p. 3, Table 1
- 15:27
SHARED WATER + LANDSCAPES · LOCAL PRESSURES / ILLUSTRATION
Also said in the narration
- 2:14
Loudoun County, in Virginia, is a major data center hub.
- 3:56
Virginia offers qualifying data centers tax exemptions.
Sales and use tax exemption for computer equipment in data centers whose operators sign a memorandum of understanding with VEDP on minimum investment and job creation.
- [6] Virginia Tax and VEDP, data center exemption report, p. 2
Our calculations
Indexed study result
The study reports a 15% average increase in issues resolved per hour. On an index where the comparison group is 100, that is 100 × 1.15 = 115. The bars show these index values, not counts of issues.
- [4] Brynjolfsson, Li & Raymond, Generative AI at Work (v2), abstract
Google bars on a 2024 = 100 scale
Each bar pair sets that measure’s own 2024 value to 100. Google’s reported changes give 2025 levels of 137 for electricity use (+37%), 98 for operational emissions (−2%) and 118 for ambition-based emissions (+18%). The three measures have different units and boundaries, so the pairs are not comparable with each other.
- [18] Google 2026 Environmental Report, p. 19; pp. 74–75
Documents
- The video’s figures are as of 16 September 2026. Every figure on this page was checked against its source on 26 September 2026.
- Page numbers are the documents’ own printed page numbers.
- The campus, grid and water scenes are illustrative 3D models, not specific sites. The video carries no evidence labels on screen; this page gives each figure its label.
- [1]
- [2]
International Energy Agency (IEA)
Key Questions on Energy and AI — Executive summary
Published 16 April 2026 · Retrieved 26 September 2026
Licence: CC BY 4.0
- [3]
Joint Legislative Audit and Review Commission (JLARC), Virginia
Data Centers in Virginia (JLARC Report 598)
Published 9 December 2024 · Retrieved 26 September 2026
Cover date. The PDF file was created on 7 March 2025.
Page numbers refer to the full report, not the separate summary PDF.
- [4]
arXiv
Generative AI at Work (Erik Brynjolfsson, Danielle Li and Lindsey Raymond · arXiv:2304.11771v2)
Published 6 November 2024 · Retrieved 26 September 2026
Version 2, posted on 6 November 2024; the PDF is dated 7 November 2024.
The journal version reports the same 5,172 agents and 15% average.
- [5]
U.S. Census Bureau
Cartographic Boundary Files: 2018 counties, 1:20,000,000 (cb_2018_us_county_20m)
Retrieved 26 September 2026
Source of the Loudoun County outline in the video.
Used at 2:14
- [6]
Virginia Department of Taxation and Virginia Economic Development Partnership (VEDP)
Published 2 January 2026 · Retrieved 26 September 2026
Covers fiscal years 2024 and 2025. Jobs and investment were reported by the operators and not independently validated (p. 3).
- [7]
Monitoring Analytics, Independent Market Monitor for PJM
Analysis of the 2027/2028 RPM Base Residual Auction – Part A
Published 5 January 2026 · Retrieved 26 September 2026
Cover date. The PDF file was created on 7 April 2026.
Sensitivity analysis: the auction cleared again without data center load. Results are modeled, not measured bills.
- [8]
Public Utilities Commission of Ohio (PUCO)
PUCO orders AEP Ohio to create data center specific tariff (Case 24-508-EL-ATA)
Published 9 July 2025 · Retrieved 26 September 2026
- [9]
AEP Ohio
Retrieved 15 September 2026
The page refused connections on 26 September 2026; the terms were checked against the archived copy of 15 September 2026.
- [10]
U.S. Environmental Protection Agency (EPA)
About the U.S. Electricity System and its Impact on the Environment
Published 18 February 2026 · Retrieved 26 September 2026
The page shows this as its last-updated date.
- [11]
U.S. Energy Information Administration (EIA)
Electricity explained: Electricity and the environment
Published 16 April 2024 · Retrieved 26 September 2026
The page shows this as its last-updated date.
- [12]
International Energy Agency (IEA)
Published 6 February 2026 · Retrieved 26 September 2026
Licence: CC BY 4.0
Used at 8:09
- [13]
U.S. Fish & Wildlife Service, Migratory Bird Program
Avoidance and Minimization Measures: Power Lines
Retrieved 26 September 2026
- [14]
- [15]
NASA Scientific Visualization Studio
The Shrinking Great Salt Lake (SVS ID 15020)
Published 6 May 2026 · Retrieved 26 September 2026
Natural-color Landsat time series, 1984–2023.
Licence: Credit: NASA’s Goddard Space Flight Center
- [16]
Aspen Policy Academy
Published 2024 · Retrieved 26 September 2026
The fact sheet carries no date; the file name says 2024 and the PDF was created on 10 December 2024.
Named on screen as the Aspen Tech Policy Hub, the Academy’s predecessor. Water-use data gathered through public records requests.
- [17]
Microsoft (The Official Microsoft Blog)
Inside Microsoft’s two-decade push to cut water intensity while scaling for growth
Published 24 June 2026 · Retrieved 26 September 2026
- [18]
Google
Published 2026 · Retrieved 26 September 2026
The report page gives no date; the PDF was created on 24 June 2026. Data for fiscal year 2025.
Company-reported figures.
- [19]
Nature Computational Science
Published 28 October 2024 · Retrieved 26 September 2026
Published online 28 October 2024, in the November 2024 issue.
Used at 12:57
- [20]
Fortum
Fortum has started heat production at two large data centre sites in Finland
Published 6 May 2026 · Retrieved 26 September 2026
- [21]
PJM Interconnection (PJM Inside Lines)
PJM’s Updated 20-Year Forecast Continues To See Significant Long-Term Load Growth
Published 14 January 2026 · Retrieved 26 September 2026
Used at 14:22
Corrections
26 September 2026 · 1:00
Was: The on-screen source lines at 1:00 and 7:20 credit the IEA figures to “Energy and AI, 2026”.
Now: The report is the IEA’s “Key Questions on Energy and AI” (2026). “Energy and AI” is a separate IEA report from 2025.
Corrected in: The episode’s source page and the video description
26 September 2026 · 3:18
Was: The narration says the 2024 report on data centers came from “Virginia’s Legislative Research Commission”.
Now: The report is by Virginia’s Joint Legislative Audit and Review Commission (JLARC). The on-screen source line names it correctly.
Corrected in: The episode’s source page and the video description
26 September 2026 · 10:43
Was: The source line credits the Utah water-use fact sheet to the “Aspen Tech Policy Hub”.
Now: The fact sheet is published by the Aspen Policy Academy.
Corrected in: The episode’s source page and the video description
Found an error? Email [email protected] with the time stamp and your source, or leave a comment under the video.
Data and licences
- IEA: the 3D chart of data centre electricity use (2025 estimate and 2030 projection) is a work derived by owlfox.studio from IEA material and owlfox.studio is solely liable and responsible for this derived work. The derived work is not endorsed by the IEA or its Member countries in any manner. Source: IEA 2026, Key Questions on Energy and AI, iea.org/reports/key-questions-on-energy-and-ai, Licence: CC BY 4.0 (creativecommons.org/licenses/by/4.0).
- Great Salt Lake time series: NASA’s Goddard Space Flight Center, Landsat 1984–2023 (NASA Scientific Visualization Studio, svs.gsfc.nasa.gov/15020).
- Loudoun County outline: U.S. Census Bureau, cartographic boundary file cb_2018_us_county_20m.